Summary
Overview
Work History
Skills
Timeline
Generic

Jose Santos Acosta

Cicero

Summary

My 26 years at CGI Automated Mfg., I spearheaded the Welding Department, mastering robotic programming and fostering team leadership to enhance production efficiency. My expertise in machine calibration and a proactive approach to quality control significantly elevated operational standards, demonstrating a commitment to excellence and innovation in welding technology. Efficient and hardworking welding professional with more than twenty years of experience in assisting and learning from welders in pipe and manufacturing welding in TIG and MIG. Seeking a welder position to contribute a vasts mount of experience and dedication.

Overview

27
27
years of professional experience

Work History

Welding Deparment Leader

CGI Automated Mfg.
Romeoville
07.1997 - 09.2024
  • Coordinated safe, accurate setup of mechanized welding systems on-site, and the understanding of the programming necessary for the welding robot systems to run smoothly.
  • Set up and adjusted machines and equipment, such as gauges, to produce parts with precision.
  • Directed and coordinated production activities in the department, encouraging employees to meet the specifications set by management.
  • Prepared various manufacturing machines for production processes by equipping them with the required tools and parts.
  • Load raw materials into machines according to specified measurements.
  • Troubleshoot malfunctions for robotic welding systems.
  • Performed regular maintenance on machines to ensure optimal performance.
  • Programmed and maintained robotic welding systems to meet production needs, and calibrated systems as needed for optimal performance.
  • Utilization of specific tools and ISO procedures to perform QC assessments against established quality and safety thresholds.
  • Reviewed blueprints and diagrams to determine job specifications, plan production activities and organize proper supplies.

Skills

  • Robotic programming
  • Welding system setup
  • Machine calibration
  • Quality control
  • Technical troubleshooting
  • Safety compliance
  • TIG welding
  • MIG welding
  • Equipment setup
  • Blueprint interpretation
  • Machine maintenance
  • Material handling
  • Problem solving
  • Team leadership
  • Aluminum welding
  • Stainless steel welding

Timeline

Welding Deparment Leader

CGI Automated Mfg.
07.1997 - 09.2024
Jose Santos Acosta