John Vodicka

Site Construction Supervisor
Rockford

Summary

Seeking an entry to mid-level professional position centered on team work and a positive work environment that requires extensive home construction experience and an acute attention to detail.


Overview

15
15
years of professional experience
5
5
years of post-secondary education

Work History

Property Management Assistant

Full Frame Enterprise
10.2022 - Current
  • Enhanced client satisfaction by delivering high-quality remodeling projects within budget and on schedule.
  • Strengthened relationships with key suppliers to secure preferred pricing on materials without sacrificing quality or craftsmanship.
  • Developed comprehensive project plans outlining scope, timeline, and budget for effective project management.
  • Maintained a safe working environment by adhering to industry safety standards and regulations.
  • Spearheaded the implementation of environmentally friendly building practices to reduce environmental impact while providing cost-saving benefits for clients.
  • Collaborated closely with architects, designers, and other construction professionals to ensure seamless project execution.
  • Improved company reputation through consistently delivering exceptional results in all remodeling projects.
  • Increased project efficiency by effectively managing subcontractors and ensuring timely completion of tasks.
  • Established a positive working atmosphere among team members facilitating collaboration and efficient workflow across all stages of the remodeling process.
  • Demonstrated strong attention to detail in completing intricate finish work such as custom cabinetry or detailed molding installations.
  • Adapted quickly to unforeseen challenges during construction, employing creative problem-solving skills to keep projects on track.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Worked on sites, installing roofs and other exterior components.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Installed drywall, siding and other structural components.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Operated forklifts and boom lifts to complete various tasks.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Effectively managed multiple concurrent projects while maintaining strict deadlines and high-quality standards.
  • Optimized material usage by accurately estimating required quantities, minimizing waste, and reducing costs for clients.

Lead Flooring Installer

Veterans Floors
02.2020 - 08.2023
  • Established strong relationships with suppliers, negotiating favorable pricing terms on high-quality materials.
  • Expanded company offerings by becoming proficient in the installation of various flooring types, including hardwood, laminate, tile, and carpet.
  • Streamlined the installation process for increased efficiency and reduced project completion time.
  • Spearheaded team training programs, resulting in higher overall skill levels and improved customer satisfaction ratings.
  • Developed customized installation plans to accommodate unique client preferences and design requirements.
  • Reduced waste by accurately measuring spaces and optimizing material usage during installations.
  • Established reputation for superior craftsmanship by consistently delivering flawless flooring installations.
  • Operated hand tools and machines to cut material and achieve proper fit around obstructions.
  • Supplied accurate measurements and estimates for projects.

Maintenance Technician

TDCJ
02.2015 - 09.2019
  • Member of crew responsible for the weekly inspection of assets, the creation of work orders for any items found to be deficient, and parts procurement from assigned work orders;
  • Conducted need-analysis on varying types and levels of repairs based on health and safety standards;
  • Reviewed and implemented daily work orders in accordance with established policies and procedures;
  • Coordinated job-specific material acquisition for work assignments, and maintained the worksite equipment inventory according to all company policies and procedures;
  • Reviewed blueprints, schematics and other design documents in order to apply the most efficient and cost-reasonable level of repair;
  • Completed all required work on time and within finite budget;
  • Conducted minor repairs to living spaces in order to maintain a high level of safe and sanitary living conditions, including minor electrical and plumbing work as well as general carpentry and welding work; and
  • Awarded 'S-2' status as a result of extemporary work performance and adherence to all rules and regulations throughout the facility with zero infractions

Welder

Greenbrier (Formally GBW Railcar Service LLC)
08.2014 - 02.2015
  • Responsible for the welding, repair and sanitation of various types of railcars;
  • Required to utilize safe-work practices within confined space work environments in accordance with all rules and authorities outlined in 29 CFR Part 1926;
  • Designed and implemented improved sanitation procedures for the safe rail-car transportation of produce and agricultural products to meet and exceed all local, state and federal regulations; and
  • Required to draft and submit daily progress reports and assist management with navigating site issues to ensure the continuous flow of production-transit on and off site

Fitter/Welder, Crew Lead

Hidalgo Industrial
03.2013 - 08.2013
  • Hand-chosen to participate on the Lockheed Martin Roof Drain Project to replace former crew due to extemporary performance and perfect adherence to rules and regulation, both site-specific and company-wide;
  • Promoted to Crew Lead of 12-person crew assigned to Building 4, Phase II of the Lockheed Martin Roof Drain Project;
  • Successfully installed multiple thousands of feet in roof drains and supporting infrastructure (hanger installation, industrial piping and roof work); required blue print review and accurate application, safe work practices while working directly over multiple millions of dollars' worth of aircraft in Lockheed Martin's assembly line and extreme time-management skills to meet production goals that were over 2 months behind schedule due to prior crew setbacks; completed project on time, and with zero infractions; and
  • As Crew Lead, designed and coordinated daily task assignments for all crew members, conducted daily safety talks and site considerations for work to be completed, reviewed and adhered to all schematics, exercised excellent communication to senior management through the submission of daily project progress reports and offered senior management regular forecast updates of project completion

Owner

Vodicka's Welding
08.2012 - 03.2013
  • Holistic installation and maintenance services including, but not limited to welding, design and construction of water/drainage systems, facility utility-repair, agricultural security-fence installation and repair, as well as additional industrial work as required;
  • Coordinate all aspects of projects to include all advertising, customer relations, initial cost and time estimates, budget management, project progress updates, logistics of product deliveries and all subcontractor oversight; and
  • Designed and produced professional bids/quotes for services, work write-ups, invoicing and the accurate tracking of all projects

Lead Material Handler

Sabre
02.2011 - 08.2012
  • Responsible for managing the intake, storage, tracking and distribution of materials for all sections of the Tubular Structures segment of the Sabre organization;
  • Daily review of multiple project sites to collect and record all required parts for project completion through the analysis of blueprints, regular communication with project staff and active participation in project meetings;
  • Implemented new process of material handling and tracking that streamlined project completion through the increased efficiency of the parts-ordering process for welders, fitters, long-seamers and other various staff associated with the fabrication and assembling of industrial tubular steel polls;
  • Promoted to Lead Material Handler, responsible for coordinating the daily tasks of a 4-person team in charge of the successful completion of material requests from 6-10 project locations consecutively, totaling approximately 200 completed orders per shift; and
  • Conducted daily Safety Tool-Box briefs, disseminated daily work tasks and special site considerations, managed equipment inspection logs and accurately submitted daily, weekly and monthly progress reports to senior management

Lead Welder

Supreme
03.2010 - 12.2010
  • MIG and aluminum welder;
  • Consistent communication with supervisors to insure that projects were completed in a timely manner; and
  • Highly valued member of 6-person crew, tasked with additional duties involving problem solving and crisis-management on a regular basis

Education

Computer Aided Drafting Certificate -

Trinity Valley Community College
Palestine, Tx
01.2015 - 01.2019

Production Welding Certificate - undefined

Hill College Welding
Cleburne, Tx
01.2009 - 01.2010

Continuing Education Certificate - undefined

South Plains College
Lubbock, Tx

G.E.D. Certificate - undefined

South Plains College
Lubbock, Tx

AA degrees - Business Administration, Computer Aided Drafting

Tarrant County Community College

Skills

Property maintenance

Exceptional oral and written communication skills

Property management

Maintenance

Skilled multi-tasker

Problem-solving

Time management

Problem-solving abilities

Multitasking

Self motivation

Upcoming Certification

Tarrant County Community College, 3 classes left to complete 2 separate AA degrees; one in Business Administration and the other in Computer Aided Drafting; continued from Trinity Valley Community College.

Additional Work Experience

Part-time construction and home repair contractor for over 15 years, with work in roofing, siding, flooring, framing, electrical plumbing, landscaping, carpentry and finish-carpentry.

Timeline

Property Management Assistant

Full Frame Enterprise
10.2022 - Current

Lead Flooring Installer

Veterans Floors
02.2020 - 08.2023

Maintenance Technician

TDCJ
02.2015 - 09.2019

Computer Aided Drafting Certificate -

Trinity Valley Community College
01.2015 - 01.2019

Welder

Greenbrier (Formally GBW Railcar Service LLC)
08.2014 - 02.2015

Fitter/Welder, Crew Lead

Hidalgo Industrial
03.2013 - 08.2013

Owner

Vodicka's Welding
08.2012 - 03.2013

Lead Material Handler

Sabre
02.2011 - 08.2012

Lead Welder

Supreme
03.2010 - 12.2010

Production Welding Certificate - undefined

Hill College Welding
01.2009 - 01.2010

Continuing Education Certificate - undefined

South Plains College

G.E.D. Certificate - undefined

South Plains College

AA degrees - Business Administration, Computer Aided Drafting

Tarrant County Community College
John VodickaSite Construction Supervisor