Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Ervin Mendoza

Moline

Summary

Seasoned Roofing Foreman with a proven track record at M-1 Construction LLC, excelling in crew oversight and roof installation. Demonstrated expertise in reducing material waste, enhancing team efficiency, and boosting client satisfaction through exceptional service. Skilled in problem-solving and teamwork, contributing to significant business growth and maintaining high safety standards.

Overview

5
5
years of professional experience

Work History

Roofing Foreman

M-1 Construction LLC
06.2024 - Current
  • Managed roofing supplies, parts and equipment by ordering new materials to refill low inventory.
  • Maintained a safe working environment through strict adherence to safety protocols and regular toolbox talks.
  • Collaborated with teams of Number workers in Number different worksites.
  • Work in any weather condition including high temperatures, rain, and cold.
  • Working shift that are over 12 hours long.
  • Following very specific instructions so that the customer can be satisfied.

Roofing Foreman

JP Construction LLC
04.2020 - 06.2024
  • Managed roofing supplies, parts and equipment by ordering new materials to refill low inventory.
  • Reduced material waste by accurately measuring and cutting materials, leading to cost savings for clients.
  • Communicated effectively with team members, guiding crew in roof installations and repair work.
  • Maintained a safe working environment through strict adherence to safety protocols and regular toolbox talks.
  • Increased customer trust with transparent documentation of work procedures, pricing breakdowns, and warranty information when needed.
  • Contributed to business growth by providing excellent customer service and consistently receiving positive feedback from clients.
  • Trained workers in proper methods, equipment operation and safety procedures.

Education

Moline High School
Moline, IL
06.2021

Skills

  • Crew oversight
  • Heavy lifting
  • Team training and support
  • Maintenance
  • Roof installation
  • Teamwork
  • Problem-solving
  • Following instructions
  • Multitasking
  • High Stamina
  • Work in any weather conditions

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Roofing Foreman

M-1 Construction LLC
06.2024 - Current

Roofing Foreman

JP Construction LLC
04.2020 - 06.2024

Moline High School
Ervin Mendoza