Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic

CHARLES PANNEERSELVAM

ELECTRICALSUPERVISOR
Thanjavur

Summary

Seasoned Electrical Supervisor with over 13 years of experience managing complex electrical projects for leading EPC and construction companies worldwide, including EIFFAGE Genie Civil, HYUNDAI Engineering & Construction Ltd., ROTARY Engineering Fujairah FZE, and SINOPEC Engineering Group. Expertise includes leading high-performing teams, ensuring timely project delivery, and maintaining rigorous quality standards. Strong foundation in project management and technical skills, including proficiency in MS Office and construction management software, supports success in fast-paced environments. Committed to continuous professional development and staying current with industry trends, eager to connect with like-minded professionals on LinkedIn.

Overview

14
14
years of professional experience
3
3
years of post-secondary education
3
3
Languages

Work History

Electrical Foreman

AFCON Holding Ltd, Main Conractor: Hoffman Construction, Client: Intel Fab 38 Project,
11.2023 - Current
  • Good knowledge about Pre Task Plan (Permit to work)
  • Increased client satisfaction with clear communication, timely updates, and quick resolution of issues.
  • Provided feedback to workers on job performance and safety procedures
  • Sustained safety protocols, ensuring proper, cost-effective and safe handling and usage of equipment and materials
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected completed work to verify quality standards and compliance with criteria
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Manage materials and personnel requirements necessary to meet schedule
  • Directed projects according to schedule and quality demands.
  • Responsible for incoming materials inspection with respect to approved specification, Data sheets, Materials approval and quality plan
  • Responsible for closely coordinating site activities including coordination with all other contractors to ensure activities and progress is not impeded
  • Study job specification to determine appropriate construction methods
  • Check the electrical layout and installation of all equipment, devices must be in the standard as per
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Check all materials delivery at the site the quality, brand, as per specification and approved materials
  • Responsible for supervising and coordinating the work activities according to productivity and quality standards
  • Supervised electrical installations and ensured compliance with safety regulations.
  • Coordinated daily site activities and managed crew assignments effectively.
  • Assisted in project planning and provided technical guidance to team members.
  • Reported quality of performance on site to site construction managers.
  • Implemented safety protocols and trained staff on best practices for electrical work.
  • Collaborated with engineers to review project specifications and design changes.
  • Performed troubleshooting tasks on electrical systems as needed.
  • Supervised the work of electricians on site to ensure quality standards were met.
  • Inspected completed installations for conformance with applicable codes.
  • Trained new employees in proper installation techniques according to industry standards.
  • Coordinated activities between contractors, subcontractors, suppliers, and other personnel involved in the project.
  • Developed and managed electrical installation schedules, ensuring completion of projects within set time frames.
  • Monitored daily performance of electrical systems to ensure continuous operation in a safe manner.
  • Conducted safety inspections and ensured compliance with relevant health and safety regulations.
  • Adhered to all company policies regarding safety procedures at all times.
  • Reviewed plans and specifications for accuracy prior to commencement of works.
  • Maintained accurate records of all work performed on site.
  • Ensured that all tools, materials, and equipment used by electricians are properly maintained.
  • Identified potential hazards or risks associated with electrical installations, and took corrective action when required.
  • Prepared project reports for management review and tracked progress against budget.
  • Ensured all necessary materials and supplies were available for each job.
  • Oversaw the installationof electrical systems, ensuring adherence to safety and quality standards.
  • Conducted tests on electrical systems and equipment and reported results.
  • Used design software to produce electrical system schematics and diagrams.
  • Installation of Panel, Lighting DB’s, Power DB’s, lighting and power JB’s and socket outlets follow Approved layout Drawings and typical Drawings
  • Conduct installation of cable raceway such as; ladder/perforated trays, conduits fittings for LV and MV cables
  • Responsible for the electrical installation of cable conduits, cable trays, earthing protection, and lighting system installation.

Electrical & Instrument Foreman

EPC Contractor: HSS JV(EIFFAGE GENIE CIVIL MARINE& HYUNDAI ENGINEERING AND CONSRUCTION) PACKAGE 5, UNIT 93, OFFSHORE, Client: KIPIC Kuwait,
07.2020 - 12.2022
  • HSS JV/EIFFAGE GENIE CIVIL MARINE& HYUNDAI ENGINEERING AND CONSRUCTION) PACKAGE 5, UNIT 93, OFFSHORE PROJECT, KIPIC REFINERY PROJECT, BRUNEL ENERGY KUWAIT, KUWAIT
  • Good knowledge about Permit to work system
  • Following offshore safety regulation
  • Ensured compliance with applicable safety regulations when working on electrical systems.
  • Reviewed engineering documents such as calculations sheets, wiring diagrams, ensuring accuracy of design parameters prior to implementation.
  • Prepared and planned worksites to help jobs run smoothly.
  • Reported project progress, site problems and labor status to supervisors.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Responsible for the Electrical and Instrument installation of cable conduits, cable trays, Earthing protection lighting system installation
  • ICSS vendor supporting for Pre- Commissioning and commissioning
  • Installation for F&G Related Smoke Detector, flame detector, Heat Detector
  • Responsible for supervising and coordinating the work activities according to productivity and quality standards
  • Supervising for Electrical cables Instrumentation cables and control cable’s laying for follow the layout drawing, cable schedule
  • Witness/conduct continuity insulation test on low voltage and medium voltage cables, before and after pulling
  • Ensure all installation meet quality and Electrical codes standards
  • Manage materials and personnel requirements necessary to meet schedule
  • Power DB’s, Lighting DB’s, Lighting and power JB’s, Welding sockets, convenience sockets installation
  • Supervising for LEVEL TRANSMITTER, PRESSURE TRANSMITTER, TEMPERATURE TRANSMITTER installation.
  • HONEYWELL KNX model gas detector installation, calibration and, troubleshooting
  • Solenoid valve Maintenance and Trouble shooting for during Warranty period
  • MAMBEY Mooring System troubleshooting for during warranty period
  • Resolved issues related to instrumentation by diagnosing problems using schematics and diagrams and making necessary adjustments or repairs accordingly.

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, EPC Contractor: Petrofac International Ltd,GC 32 PROJECT, Client: KUWAIT OIL COMPANY(KOC) KUWAIT,
03.2019 - 07.2020
  • Directed and supervised complex electrical installations on large-scale construction projects, ensuring compliance with project specifications and industry best practices.
  • Coordinated with contractors and subcontractors to enforce strict adherence to safety regulations, codes, and quality standards.
  • Established and implemented robust safety protocols, significantly reducing risks during electrical installations, testing, and repair activities.
  • Oversaw daily operations of on-site electrical teams, optimizing manpower utilization and maintaining productivity throughout construction phases.
  • Partnered with project managers, engineers, and other stakeholders to synchronize electrical work with overall project schedules and milestones.
  • Analyzed and interpreted blueprints, technical drawings, and schematics to define project scope, material requirements, and execution strategies.
  • Secured mandatory permits and approvals for electrical activities, ensuring uninterrupted progress of construction operations.
  • Conducted thorough inspections of incoming electrical materials, tools, and equipment to verify compliance with specifications and project requirements.
  • Expedited project timelines through effective resource management and coordination of subcontractor schedules.

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, EPC Contractor: Petrofac International Ltd, LFPHOD PROJECT PHASE-1, Client: KUWAIT OILCOMPANY(KOC) KUWAIT
01.2017 - 03.2019
  • Administered and monitored the Permit to Work (PTW) system, ensuring all electrical activities were executed under strict safety guidelines,
  • Ensured proper risk assessments, isolation procedures, and safety checks were completed before issuing PTWs.
  • Responsible for supervising and coordinating the work activities according to productivity and quality standards
  • Supervised field crews to maximize quality and work efficiency.
  • Ensure all materials/equipment have done an inspection before installation especially on transformer and switchgear equipment.
  • 11kV /440 v and 11kV/ 3 kV oil type transformer installation follow the Approved Layout Drawings and installation Drawings
  • Reported quality of performance on site to site construction managers.
  • Installation of HT setup oil type transformers, LT LIGHTING TRY TYPE TRANSFORMER,VSD, HV ,MV panels control MCC& EMCC ,VSD , panels, LV HV BUSDUCT,DIESEL GENERATOR LOAD BANK,EGCP Panels ,ESCADA Panel
  • Completed projects on time and within budget by effectively managing resources and schedules.
  • Managed change orders professionally, negotiating fair adjustments in scope or cost with clients when necessary.
  • Supervising for Glanding TERMINATION for HV, LVCONTROLCABLES for as per following documents
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Installation for Earth Pit and Earthing bus bar
  • Supervising for Cable laying for HV, LV cables in Underground and Cable trays as per following cable schedule, layout diagram, section drawing
  • Monitoring of work progress quality check for timely completion of work

Electrical Engineer

DM POWER SYSTEM
12.2014 - 01.2016
  • DM POWERSYSTEM, CHENNAI,TAMILNADU, INDIA Chennai
  • Install circuit breakers, switches, and outlets, light fixtures, electronic equipment and Communication Systems.
  • Assemble, install, and wire the electrical systems in new homes, residential and commercial buildings.
  • Cut, thread, Bend, assemble and install conduit, electrical conductor enclosures, and fittings. Follow blueprints and wiring diagrams.
  • Installation of HV and LV panel’s, DB’s
  • LV, HV cables continuity and IR test
  • Install circuit breakers, switches, and outlets, light fixtures
  • Managed the repair and replacement of damaged electrical components/assemblies.
  • Respond to customer service and complaints and working with homeowner solving problems at their residences. Working with other trades/builders to solve homeowner issues.

Electrical Technician

EPC Contractor: ROTARY ENGINEERING FUJAIRAH FZE, Client: Fujairah Oil Terminal, Fujairah, UAE,
06.2014 - 11.2014
  • ROTARY ENGINEERING FUJAIRAH FZE LTD, FUJAIRAH OIL TERMINAL, (TANKAGE PROJECT),UAE,..
  • Electrical and Instrument Cable Laying
  • Installation of lighting dB’s, Power DB’s, industrial socket outlets and lighting fixtures
  • Installation of LV and HV panel installation
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Tested wiring and other system parts for electrical flow and function.
  • Installation testing and commissioning of electrical power, Internal lighting and External lighting
  • Obtained measurements and readings using volt and ohm me,
  • LV, HV and control cables continuity and IR test
  • Participate in Pre-commissioning and commissioning activities
  • All lighting JB Installation, Glanding and Termination
  • Instrument JB’s cable dressing, glanding and Termination
  • Cable Ladder Tray making of 45 and 90 degree and horizontal and vertical laying
  • Street light pole installation
  • Motor and MOV termination

Electrical Supervisor

DELHI ELECTRICAL CONSTRUCTION, Client: IIT Madras,
11.2012 - 04.2014
  • Managed project billing cycle including preparation of invoices, tracking payments, and reconciliation of accounts.
  • Prepared and submitted project tenders, quotations, and cost estimates in line with client requirements and company standards.
  • Analyzed project drawings, BOQs (Bill of Quantities), and technical specifications to prepare accurate cost proposals
  • Installation of HT setup transformers, control MCC panels load take off panels, VCB panels, cables laying cable GLANDING and TERMINATION
  • During troubleshooting quickly fault trace out by the electrical drawing
  • Execution of HV,LV system installation, testing and commissioning of LV panels MDBs & SMDBs LDBs consultant requirements complying with local authority standards and project specification
  • Installation testing and commissioning of electrical power, Internal lighting and External lighting, lighting control and dimming control system
  • Maintenance of all electrical equipment like motor star delta starter
  • Motor installation including switchgear design, assembling, and installation
  • Maintenance of low, medium and high voltage processes involving single and multiphase wiring
  • Monitor manpower at a site of electrical sub-contractor makes it sure that all possible activity area
  • Schedule the work activities of manpower, with due consideration of stock materials on hand, current and projected materials equipment and manpower availability
  • Conduct installation of cable Trunking, containment, cable tray, small power and lighting systems
  • Conduct installation of cable raceway such as; ladder/perforated trays, conduits fittings for lv and mv cables
  • Rewire, problem diagnosis and troubleshooting of existing electrical systems
  • Monitoring and checking all materials delivery at site, outstanding materials
  • Accounts (Sub contractor bill Budget Detail)
  • Preparation Of Rate Analysis
  • Manage construction costs to ensure project profitability
  • Repair or replace wiring, equipment, and fixtures, using hand tools and power tools

Electrical Supervisor

SURYA ELECTRICALS (EA Grade Contractor), Main Contractor: URC Construction Private Ltd, Client : Aryanet Institute Of Technology, Kerala,
06.2011 - 09.2012
  • Studied electrical drawings and implemented them accurately on-site.
  • Directed electrical workers by clearly defining tasks, quality standards, and safety requirements.
  • Coordinated and arranged required manpower to meet project schedules.
  • Prepared and submitted daily activity reports to the construction manager.
  • Assembled, installed, tested, and maintained electrical systems in residential, commercial, and industrial projects.
  • Cut, threaded, bent, assembled, and installed conduit, electrical conductor enclosures, and fittings as per blueprints and wiring diagrams.
  • Installed HV & LV panels, distribution boards (DBs), and control systems.
  • Supervised installation of 11KV/440V, 500 KVA oil-type transformers with double structure erection.
  • Managed installation and commissioning of 500 KVA diesel generators.
  • Installed and tested circuit breakers, switches, outlets, lighting fixtures, electronic equipment, and communication systems.

Education

Diploma - Electrical and Electronics Engineering

Sembodai RV Polytechnic College,
Sembodai, Vedaraniyam, Taminadu,India
06.2008 - 04.2011

Skills

Electrical Wiring

Personal Information

Timeline

Electrical Foreman

AFCON Holding Ltd, Main Conractor: Hoffman Construction, Client: Intel Fab 38 Project,
11.2023 - Current

Electrical & Instrument Foreman

EPC Contractor: HSS JV(EIFFAGE GENIE CIVIL MARINE& HYUNDAI ENGINEERING AND CONSRUCTION) PACKAGE 5, UNIT 93, OFFSHORE, Client: KIPIC Kuwait,
07.2020 - 12.2022

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, EPC Contractor: Petrofac International Ltd,GC 32 PROJECT, Client: KUWAIT OIL COMPANY(KOC) KUWAIT,
03.2019 - 07.2020

Electrical Supervisor

SINOPEC TENTH CONSTRUCTION CO LTD, EPC Contractor: Petrofac International Ltd, LFPHOD PROJECT PHASE-1, Client: KUWAIT OILCOMPANY(KOC) KUWAIT
01.2017 - 03.2019

Electrical Engineer

DM POWER SYSTEM
12.2014 - 01.2016

Electrical Technician

EPC Contractor: ROTARY ENGINEERING FUJAIRAH FZE, Client: Fujairah Oil Terminal, Fujairah, UAE,
06.2014 - 11.2014

Electrical Supervisor

DELHI ELECTRICAL CONSTRUCTION, Client: IIT Madras,
11.2012 - 04.2014

Electrical Supervisor

SURYA ELECTRICALS (EA Grade Contractor), Main Contractor: URC Construction Private Ltd, Client : Aryanet Institute Of Technology, Kerala,
06.2011 - 09.2012

Diploma - Electrical and Electronics Engineering

Sembodai RV Polytechnic College,
06.2008 - 04.2011
CHARLES PANNEERSELVAMELECTRICALSUPERVISOR